Get the Right Water Submetering Solution for New Developments
What Makes Dune Labs' Water Submeter Solution the Best Choice for New Developments?
✤ Hassle-free easy installation
✤ No Plumbing work required
✤ Remote and automatic meter reading
✤ Accurate billing based on actual usage
✤ Cost reduction and water conservation
✤ Advanced leak detection
Meter Every Unit From Day One
For developers, the easiest time to install water submeters is during construction—before residents or tenants move in. Planning unit-level metering into your project ensures every apartment, townhome or commercial space is measured from day one. Billing is ready at lease-up, future retrofits are avoided, and there’s no need for historical utility data to get started.
Dune Labs’ clamp-on submeter installs on the outside of each unit’s water supply line without cutting pipes or adding plumbing work for compatible pipe types and sizes (PEX, PVC, CPVC and rigid copper, ½” to 1″). Builders can incorporate accurate water metering into new developments with minimal installation effort and no disruption to construction schedules.
From Design to Lease-Up
| Project Stage | What Happens |
|---|---|
| Design | Plan a dedicated water supply line for every unit, provide accessible locations for submeters, and keep common-area and irrigation lines separate for accurate tracking. |
| Permitting | Review local and state submetering requirements with your project team, legal counsel, and utility provider before construction begins. |
| Construction | Install Dune clamp-on submeters once supply lines are accessible. Choose either Dune’s installation service or self-install with remote guidance from the Dune team. |
| Commissioning | Verify every meter is assigned to the correct unit and confirm data is reporting properly before residents or tenants move in. |
| Lease-Up | Activate billing, configure resident accounts, and provide any required disclosures before the first water charges are issued. |
| Stabilization | Monitor water usage for every unit. Dune automatically identifies unusual consumption patterns so maintenance teams can investigate potential leaks quickly. |
Install Dune Water Submeters. No Plumbing
Do New Developments Have to Install Water Submeters?
In some states, yes. Requirements vary by state, local utility and building type. Two examples from our state guides:
Texas
Requires apartments, condominiums, manufactured home rental communities and multiple use facilities begun after January 1, 2003 to measure each unit’s water (Tex. Water Code §13.502(b)).
Colorado
Requires residential premises built with permits applied for on or after July 1, 2027 to have water metered by the utility or by submeter (HB26-1013).
Florida has no statewide mandate, but some counties require submeters in new multi-unit buildings, and North Carolina requires billing on metered use. See our guides for Texas, Arizona, Florida, Colorado and North Carolina. This is general information, not legal advice.
Why Developers Choose Dune
No Plumbing Scope Added
The meter clamps onto the outside of the pipe, with no pipe cutting and no water shut-off.
One Meter for the Whole Building
A single submeter variant covers every compatible pipe type and size.
Billing Ready at Lease-Up
Dune uploads each unit’s usage into your property management software.
Accurate to Within 2%
Dune’s meters meet American Water Works Association (AWWA) standards.
NOI from Stabilization
Recovering water costs from the first lease, and the typical 15–20% reduction in water use Dune sees across its customers, both support net operating income.
Ready to add water submetering to your next development?
Get a Free Quote for Your Project →